Project finances

You follow the money in three places. Your Dashboard shows a finance row per production. A project's Finance tab holds its finance tools and the daily cost, and Crew cost on its Hours & pay tab breaks the crew money down. Every figure there is excl. VAT, apart from Cash flow, which shows invoice totals incl. VAT.

CrewShift calculates these figures from signed deals, the schedule and logged hours. They're estimates. Check them before you pay anything or send them on.

Your dashboard

From top to bottom, the Dashboard shows:

  • Production calendar: your projects' days in a month, week or agenda view, with a warning where crew are booked on two of your projects at once. Tap a date to see what's on, then tap a day in the list to open it. See The calendar. Add day puts a day on the selected date. With more than one project you choose which one under Select project first.
  • Your crew-days balance. See Where to see your balance.
  • Needs your attention, with a count per item. Only items with something waiting appear.
  • Active projects: a card per project with its finance row, the one furthest over its budget first.

When your crew-days balance runs low, a warning sits above all of this. While a deal awaits you, Needs your attention moves up, above the calendar.

Needs your attention can hold five items:

  • Invoices overdue: approved invoices past their due date. Tapping it opens the project with the most of them on its Hours & pay tab.
  • Timesheets to approve and Invoices to approve both open your Inbox.
  • Deals awaiting you: negotiations and schedule changes waiting on you, including an accepted offer whose deal memo you still have to send. With one negotiation waiting and nothing else, this opens that project's Negotiations tab; otherwise your Inbox.
  • On me: everything else on your Inbox's On me tab, such as purchase orders to approve, budget shifts and funder deadlines. It opens your Inbox.

Only when your Inbox's On me tab is empty too do you see You're all caught up.

A project card shows the production's finance row, every figure as the cost report computes it and excl. VAT: EFC (estimated final cost), the budget it is measured against (Locked budget v1, or Working budget before the first lock), Open PO, Secured (committed + received) and Shortfall vs secured (the budget minus the secured financing; below zero means covered). Under it: On me, Waiting on others with the oldest item, whom it waits on and since when, and At risk (budget shifts, items waiting more than 3 days, and funder deadlines). If you enter vendor invoices, Work queue counts what is To book, Sent back, Ready to pay, Batches to confirm and Floats to reconcile; each count opens its page. Tap the card to open the project's Finance tab. Days left says how much of the shoot remains. Projects you co-produce carry a Co-producer badge.

The Finance tab

Open the project and tap the Finance tab. It shows for the producer, co-producers and approvers who hold the Purchasing, Finance or Accounting right. Other crew don't get the tab.

For the producer, co-producers and approvers with Finance or Accounting, the tab starts with the money card, Finances. All figures are excl. VAT and come as the cost report totals them:

  • Budget, Realised, Open PO (open purchase orders and signed crew days still to come), ETC and EFC.
  • EFC vs the basis: the latest locked budget (Locked budget v1), or the Working budget before the first lock. EFC covers 8 of 111 codes says how many budget codes have spend, open PO or an ETC. Codes without any count as 0, so early in a production the EFC is not yet a forecast of the whole film.
  • Total financing (plan), Secured (committed + received) and Shortfall vs secured (the budget minus the secured financing; below zero means covered), from the financing plan.
  • Crew cost, and As of with the time the figures were made. Tap ↻ next to it to fetch the money card, Needs your attention and Work queue again; the figures stay on screen until the new ones arrive.

Needs your attention counts what is On me (as on the Inbox tab) and what is Waiting on others, lists the three items that have waited longest with whom they wait on and since when, and shows At risk: budget shifts, items waiting more than 3 days, and funder deadlines. Each count opens your Inbox. Accounting has no approvals, so it sees no On me. The producer and co-producers also get Work queue, the counts of vendor invoices to book or sent back, payments ready, batches to confirm and floats to reconcile; for a co-producer it comes first.

Approvers with Finance or Accounting also get a Finance · [project] card per production on Today, with EFC, Open PO, the shortfall, On me when something waits on them, and the buttons Cost report and Open finance.

Activity lists the latest finance events of the production, newest first: orders, invoices and floats submitted, approved, passed on or sent back, payments confirmed, rebookings, ETC changes and budget locks, each with who, when and the amount. All activity shows the rest. The producer and co-producers see the whole production; an approver whose Finance or Accounting right covers some departments sees those departments, the production-wide events (payment batches, budget locks) and their own items. With Purchasing only there is no Activity block: the History on your own orders and floats shows their steps.

Tools opens the finance pages of the production. Each page decides what you may do there, so the list follows your rights:

  • Producer and co-producers: Budget, Cost report, Purchase orders, Vendor invoices, Petty cash, Payments, Financing plan, Finance settings (the Edit project sheet) and Vendors (on your profile, for the members of the production's organisation). Others see who manages the vendors.
  • Finance or Accounting: Cost report, Purchase orders, Vendor invoices and Petty cash.
  • Purchasing only: Purchase orders and Petty cash, with your own orders and floats.

The back arrow on each page returns you to the Finance tab. For the producer and co-producers, the daily cost report sits under Daily cost at the bottom of the tab.

Crew cost

Open the project's Hours & pay tab. Crew cost sits at the top and refreshes on its own whenever hours, invoices, deals or days change. The time next to the title tells you when it last did. Only the producer and co-producers see it.

The large line at the top compares the forecast with what you've signed for: "€ 1.250,00 over plan", "€ 800,00 under plan" or On plan. A gap within 2% of your signed commitments (or within €100 on a small project) counts as on plan.

Below that sit the figures:

  • Signed commitments: confirmed crew on their scheduled days, at the rates in their deal, including per diem and gear. Cancelled days don't count, and neither do released crew or days where someone is switched off. Hourly crew are priced from call time to estimated wrap. A project buyout or monthly fee is spread over the days it covers.
  • Actual to date: the calculated pay of every logged day, whatever its status, from draft to invoiced. Late-cancellation fees count here too.
  • Still to come: signed commitments for the days after today.
  • Forecast at wrap: actual to date plus still to come. That's where the production lands if the rest goes to plan.
  • Overtime & expenses: what the logged days cost on top of the base rates. Overtime, premiums, expenses and mileage all end up here, so this is the figure you can steer on set. It turns red as soon as it's above zero.
  • Awaiting approval: the part of actual to date in submitted timesheets that aren't approved yet, ones with a proposed change included.
  • Not yet submitted: the part in days that are still open or in draft.
  • Expenses: the expenses inside actual to date.

The last three only appear once they're above zero.

Under the forecast you'll also see how many crew are committed and, when it applies, "3 positions not yet signed". Those positions (unfilled, recommended, in negotiation or waiting for a signature) are left out of signed commitments, which is why this total and the Scenarios estimate of the whole plan rarely match.

The chart plots actual spend against the plan and the forecast over the shoot. Next to the large line, a meter sets Shoot progress against Budget spent.

By department lists each department's forecast minus its signed commitments, worst first, with a bar for what it has spent so far. If no department is over, it says "Every department on or under plan".

Until someone signs, the card shows "No committed costs yet". It says "2 crew confirmed, no costed shooting days yet" when crew have signed but none of their days are on the schedule.

Your crew-days card comes last. See Where to see your balance.

Cash flow

Cash flow follows the crew invoices, in amounts incl. VAT:

  • To approve: submitted invoices still waiting for approval, from you or from a Finance approver.
  • Outstanding: approved invoices that haven't been paid, overdue ones included.
  • Overdue: approved invoices past their due date. The amount turns red.
  • Paid: invoices marked as paid, including the ones where the crew member hasn't confirmed receipt yet.

Invoices have a 30-day payment term from the day they're submitted, and become overdue the day after the due date. See When you're paid. The invoices themselves are listed further down the same Hours & pay tab.

Project IBAN and organisation

Each production can have its own bank account. Open Edit project and fill in Project IBAN, below the production company, KVK number and VAT number. Funders such as the Netherlands Film Fund expect production costs to be paid from a dedicated account for the production. Without one, the costs may not count towards incentives, so the sheet shows a warning until you add an IBAN.

The production company, KVK number, VAT number and IBAN together are the production's entity. The first time you save them, the project joins your organisation: your production company in CrewShift. You find it, with its members, under Organisation on your profile. It carries the company name from your producer profile, so changing that name renames the organisation. A co-producer can edit the entity too. The project still belongs to your organisation.

Vendors

Vendors are the rental houses, suppliers and other companies your productions buy from. They belong to your organisation, so every production of the organisation shares one list. You find it under Organisation on your profile. Tap Add vendor, or tap a vendor to edit or delete it. Every member of the organisation can do this. Vendors never get an account in CrewShift.

  • KVK number or company name: pick a company from the KVK register to fill in its name, KVK number and address.
  • VAT number: tap Check to look the number up in the EU VIES register. A valid number fills in the name, address and country that VIES returns.
  • IBAN: the vendor's bank account. It is checked when you save.
  • Country and Tax residency: two-letter country codes, such as NL or BE.
  • Affiliated party: the vendor is related to the producer or the production company.
  • Subcontracted abroad: the vendor has the work done by others outside the Netherlands.
  • Payment terms: On account (you pay after the invoice) or Prepay (you pay before delivery).

Funders treat spend with affiliated parties and work done abroad differently, which is why these are recorded per vendor.

Exact Online

Connect your organisation's Exact Online administration under Organisation on your profile, and CrewShift books every approved invoice in it as a purchase entry (inkoopboeking) with the invoice file attached. Every member of the organisation can connect it and set it up. The Exact Online block appears only once CrewShift has the link switched on.

  1. Tap Connect Exact Online and sign in to Exact. CrewShift connects the administration you have open in Exact.
  2. Tap Mapping and choose:
    • the Purchase journal the entries go in;
    • for each production, the Exact project it is booked on, or a cost centre when the administration has no project module;
    • the Exact VAT code for each kind of VAT (21%, 9%, 0%, exempt, reverse charge, intra-EU acquisition, import);
    • the GL account for each hoofdpost. The 4-digit Filmfonds code of each line goes in the cost unit (kostendrager), so add the Filmfonds codes you use as cost units in Exact.

The mapping belongs to the administration. Connect another administration and you map it again.

What is booked: approved vendor invoices, with a line per code, and crew invoices from approval on, on the crew member's Filmfonds code. A new approval sends the invoice straight away; Push now sends everything that is waiting. Each invoice is booked once: a second push finds the entry already in Exact.

The supplier is looked up in Exact by KVK number, then by IBAN. CrewShift never creates suppliers. When none matches, the push is Blocked: add the supplier in Exact with that KVK number or IBAN, then tap Retry.

Blocked and failed: a blocked push tells you what to fix (a missing mapping, an unknown supplier); Push now checks every blocked push again. A failed push shows Exact's own message; CrewShift tries again a few times on its own when Exact is briefly unavailable. Exact allows 60 requests a minute and 5,000 a day per administration, so a large batch can wait for the next push.

The booking list fills its Rekening column from the same GL mapping.

Insurance

Store your insurance policies and certificates in CrewShift, so you can send a certificate when a rental house or location asks for one. A document belongs to your organisation (for example the annual production policy) or to one project (for example a certificate for a single shoot). Organisation documents sit under Organisation on your profile; project documents sit under Insurance on the project's Planning tab.

Tap Add document, choose Policy or Certificate, and fill in the insurer, the policy number, the cover dates and the PDF. Expires on is the last day of cover. Tap a document to download it, or the bin to delete it; deleting names the insurer and policy number and asks you to confirm.

The files are stored privately. Organisation documents show for the members of the organisation, and only they can add or delete them. Project documents show for the producer, co-producers and approvers with the Finance or Accounting right; only the producer and co-producers can add or delete them.

When a document's cover ends before or during a project's shooting days, the project's document shows Ends before the shoot or Ends during the shoot, and a warning appears in your inbox. It goes away when you add a renewal of the same type from the same insurer that covers the last shooting day, or when you delete the old document. Premiums are budgeted as ordinary lines on the 6500 codes.

Reports and exports

The production's cost report opens from Cost report on the Finance tab, the daily cost report sits under Daily cost on the same tab, and budget history stays on the Planning tab. The crew-only exports sit under Crew cost exports on the Hours & pay tab. The crew cost report and the crew final settlement group costs by cost code, taken from the project's cost-code template. On a computer the file downloads. On your phone the share sheet opens, so you can save it to Files or send it on. On the cost report, the Funder tab lists every export under Exports; the final-accounts files say when they open up.

Cost report

The crew cost report is a download: tap Excel under Crew cost exports on the Hours & pay tab. For the cost report of all the production's money, see Crew and non-crew cost report.

Each department, and each job title inside it, gets four columns:

  • Budget: what the signed plan costs, the same figure as signed commitments.
  • To date: every logged day, from draft to invoiced.
  • Still planned: signed days after today.
  • Forecast: to date plus still planned.

Each line also shows forecast minus budget, and that gap as a percentage of the line's budget. The Filmfonds asks for an explanation of any line that's more than 10% off, over or under.

The file has a second tab, Crew detail, with one row per crew member per day: hours, base fee, overtime, premiums, gear, per diem, expenses and the status of the day.

Crew and non-crew cost report

Tap Cost report on the Finance tab for one report across all the production's money: crew, vendor invoices and purchase orders. It has a row per Filmfonds code, grouped under its hoofdpost, and six columns:

  • Budget: the latest locked baseline. Without one, the working budget, and the report says so. A contingency rebooking is included: it moves budget from the contingency to the code, and both rows say how much, for example "Rebooked −€ 100,00 to 3240". EFC vs budget and the flag below use this budget.
  • Realised: crew actuals, the same figures as the crew cost report, plus booked vendor invoices.
  • Open PO: what committed purchase orders still hold, plus the signed crew days not yet worked (the same still-to-come figure as the crew cost report). When an invoice is booked against a PO, that amount moves from open PO to realised, so the EFC stays the same.
  • ETC: your estimate to complete, entered per code with ETC. Use it for what you know is still coming beyond the open orders and the signed crew.
  • EFC (estimated final cost): realised plus open PO plus ETC.
  • EFC vs budget: EFC minus budget, with a + or − sign.

The report has three tabs: Report, Funder and Final accounts. The Total row is on top. Tap a hoofdpost to fold its codes away. Tap a column header to sort by it, again to reverse; on a phone use Sort by. Under a code, Bookings opens its bookings on the vendor-invoices page and Open POs its open purchase orders; with an as-of date set these links are hidden, since those pages show today. Show all there lifts the filter. With approval rights for some departments only, My departments shows their hoofdposten; the Total row stays the whole production. Production at the top opens the same report for another production you may see it for.

Show switches every column to one part of it: NL (L1), the other territories L2 to L5, the incentive-qualifying part or the internally charged part. A booking or order takes the territory and incentive setting of the largest budget line on its code. A booking's own qualifying amount replaces that setting when your funder rules include the incentive. An affiliated vendor, or a crew line whose engagement type is Affiliated, makes it internally charged and never qualifying. Set the engagement type (ZZP, employed, via a payroll company or affiliated) when you edit a crew position.

With the incentive in your funder rules, the report shows an Incentive estimate: 35% of the qualifying costs in the EFC, counted up to 80% of the total EFC. It is an estimate under the rules you pinned, not the amount the fund will set.

A hoofdpost whose EFC moves 10% or more against its budget is flagged, or the threshold of the funder rules you pinned. The flag shows the signed percentage, EFC vs budget. Hoofdposten with no realised costs, open orders or ETC yet are grouped under one line.

Without the Finance or Accounting right you see the rows without amounts: every figure shows as —, and one line above the table says the amounts are hidden for your role.

Pick an As-of date (peildatum) to run the report as of that date, for an interim payment request. Bookings, purchase orders and baselines after that date are left out. Crew actuals and signed crew days still to come stay as of today. Today puts the report back on today.

Excel (Fund layout) exports the figures of the date shown, and the file name carries that date; a message names the file once it has downloaded. It uses the column layout of the Filmfonds example cost report: budget, orders, still expected, actual and PO + actual, each with total, internal, L1 to L5 and incentive, and the variance.

Booking list

Booking list (xlsx) under Exports on the cost report's Funder tab downloads every booking of the production in the columns of the Filmfonds example "Uitdraai administratie": period, date, debit or credit, document number, description, amount, kostenplaats (the 4-digit code), journal, account (the GL account from the Exact Online mapping, when the organisation has one), supplier, paid yes/no, remark, qualifying yes/no, and the 1st interim, 2nd interim and final amounts. It covers vendor invoices, crew invoices and cancellation fees. Each claimed booking shows its amount under the request that claimed it; a qualifying booking not claimed yet shows under final. Any accountant can import it into their package.

Interim payment requests

Under the incentive you can request two interim payments: the 1st after the shoot, the 2nd at picture lock. On the cost report's Funder tab, pick an As-of date and tap Create 1st interim payment request (later the 2nd). It claims every booking that is paid on or before that date, dated on or before it, qualifying, and not claimed by an earlier request. A booking is claimed once: the 2nd request never claims what the 1st did. Creating the same request again with the same date changes nothing.

Once a request exists, its row under Exports has Pack (xlsx), which downloads the request's pack in one workbook: the cost report as of its date, the paid qualifying costs per code (earlier requests and this one), and the booking list up to that date, whose column for this request adds up to the request's total.

Funder deliverables shows for those who see the cost report's amounts; they download the booking list and the packs from Exports. Those who run the production's finance create requests and set the dates: the producer, co-producers and members of the production's organisation, on a production with funder rules pinned.

Funder calendar

The funder calendar lists the moments of your funder rules: end of shoot (the last shooting day), the cost overview due a number of days after it, picture lock, and the final-accounts deadline counted from completion. Enter the Picture lock and Completion dates on the cost report's Funder tab. Until a completion date is set, the final-accounts deadline is counted from picture lock and marked as approximate.

Each moment shows in your inbox from 30 days before until 14 days after its date.

Daily cost report

Under Daily cost on the Finance tab, for the producer and co-producers. Planned against actual crew cost for every shooting day, with a line per department under each day. A day that runs over shows up while you're still shooting.

A day still ahead is marked Upcoming. Today or a past day without logged hours shows No actuals. Hours on a date with no scheduled day show up as Off plan. A cancelled day has no planned cost, so the only amount on its row is any late-cancellation fee. Total to date at the bottom only counts days that are shot and logged. Download it as CSV.

Daily non-crew costs, right below it, lists the booked vendor invoices per day, excl. VAT, with a line per hoofdpost.

Budget history

On the Planning tab. Every plan decision that changed the budget, newest first: days added, removed, moved or cancelled, promoted scenarios with what they changed, and every locked budget baseline with the move from the previous one. Each entry says who made it, whether it happened before the shoot, during it or after wrap, and the plan cost before and after (Plan cost: the projected cost of the plan either side of the decision). Download it with Export CSV or Export PDF.

Final settlement

Tap Crew final settlement (hours and pay) under Crew cost exports on the Hours & pay tab. This Excel file is the crew-cost part of your Filmfonds accounting, and it has two tabs:

  • The cost report, in the language you use the app in.
  • Uitdraai administratie: every crew invoice that has been submitted, split into coded rows without VAT. Labour goes to the crew member's role code, per diem to 4000, mileage to 3700, other expenses to their own code and gear to the department's equipment code. This tab is always in Dutch, because its columns follow the Filmfonds layout, so you can paste the rows straight into your accounts. Invoices you've marked as paid count as paid.

Drafts and cancelled invoices are left out.

For the final accounts of all the production's costs, with the check before hand-off, the variance explanations and the audit bundle, see Final accounts.

Pay register

Tap Pay register under Crew cost exports on the Hours & pay tab. An Excel list of every submitted crew invoice, grouped per crew member, with base fee, overtime, premiums, gear, per diem, expenses, subtotal, VAT, total and the invoice's status. Drafts and cancelled invoices are left out.

When a crew member has booked an invoice in Moneybird or e-Boekhouden, the final settlement and the pay register list their bookkeeping number first, with the CrewShift number in brackets.

Funder rules

Open Edit project (the pencil next to the project title) and pick the funder under Funder rules: Filmfonds selective funding, the Netherlands Film Production Incentive (NFPI), CoBO, or none. The project then follows that funder's regulation: caps on producer's fee, overhead and contingency, the base those percentages are calculated over, the 10% rule for changes per hoofdpost, the supplier-declaration threshold, deadlines and audit tolerances.

Each regulation is stored as a version with the date it took effect. Saving pins the version in force that day, and a pinned version never changes: when a funder publishes new rules, your project keeps the version you chose until you switch to another funder, or remove the funder, save, and pick it again. Under the picker you see the version and the date it took effect. A note tells you when the values are still being checked against the latest regulation text.

The producer and co-producers pick the funder.

Filmfonds code tree

In Edit project, View the Filmfonds code tree opens the budget codes of the Filmfonds budget model (February 2026): every 4-digit code under its hoofdpost, with its unit and NPO category. Codes that can never count towards the incentive are marked Not qualifying. Search by number or name.

The codes are fixed. Nobody can add or change them, so your budget and cost report always use the codes the Fund accepts. Every crew job title belongs to a code in the tree, and so does every expense type. You build the budget on these codes.

Who can see this

The producer who owns the project and its co-producers. Both see the same figures and can download every report.

Nobody else sees them. Crew never see production figures, and approvers in your approval chain don't get Crew cost or these reports, whatever their rights. The one exception is the crew and non-crew cost report: approvers with the Finance or Accounting right open it from the project's Finance tab, see its figures and enter ETC. Other approvers in the chain see its rows without amounts. A bookkeeper with the Accounting right downloads single invoices from Hours & pay instead. See Settling invoices with the Accounting right.